ABS Brymar Floors and Kontrad LLP together are able to offer the
full range of services ranging from laser levelling of Type 1 material to
achieve tight tolerances through to the design of fully piled ground floor
slabs.
ABS Brymar Floors can offer a full
service from assisting in the advice of sub-base preparation right through to
plate bearing tests prior to concrete pouring.
Utilising the latest techniques in
Laser dozer levelling we are able to level areas up to 5,000 m² in a day
to a tolerance of + / - 5mm.
In order to achieve the most accurate
results possible it is recommended by Kontrad LLP, that the
sub-base to be tested should have been levelled and rolled extensively to
eliminate any heaving and rutting prior to any testing.
The building should be as weathertight
as possible with the ground dry to prevent misleading results. The Plate
Bearing Test is then carried out on the finished sub-base.
Plate Bearing Tests are carried out in
accordance with BS 5930.
Offering a wealth of in-house experience
in Geotechnical Engineering and methods of ground improvement techniques we are
able to offer advice on all forms of slab construction.
|